Hospitality
Corporate
Conference
Residential
Restaurant


 
 
Name of Project: Marathon Harbor Resort and Marina  
Location: Marathon, Florida  
Owner: Marathon Partners LLC  
Construction Cost: $22 million  
Client Contact: Mr. Robert Boykin  
     
Description: The Marathon Harbor Resort and Marina Redevelopment is a 10-acre (7.5 land acreage) resort located in Marathon, Florida. The existing hotel known as “Banana Bay” will be raised in its entirety to make way for this new development. The redevelopment will include transforming the property into a resort destination containing 58 residential units, a reception building, pool and bath house, marina, as well as other site amenities. A separate restaurant parcel has been designated.

The residential structures are two story structures containing a ¾ kitchen, 2 ½ baths, 2 bedrooms, living / dining room, balconies, and storage. The reception building is programmed to contain all common hotel and maintenance functions, as well as a managers housing unit. The bath house contains the pool bathrooms, storage, equipment, and a small outdoor bar area. All residential building envelopes are constructed from concrete and designed to meet the stringent 150 mph building codes. Each residential unit has grade level parking with two living floors above. The commercial buildings (reception, pool, restaurant) will be constructed predominantly of wood designed to meet the 150 mph building codes and elevated above the flood zone.

The construction will be divided into five phases. The first is the dock master station, second is the marina, third is the two Type 3 residences, followed by the main resort complex, and concluding with the construction of the restaurant under a separate contract with either the developer or the restaurateur.

Our office provided full A/E and interior design services for the project.